Customer Results
Town
Installation Data
Result
Pearl River, LA
Installed in a “large portion” of their collection system
Pump run time and repairs reduced, plant washouts eliminated, chlorine gas expense reduced 35%, SSO’s reduced and total cost of pumping ad treating reduced
Pearl River, LA
INSTALLATION: Installed in a “large portion” of their collection system
RESULT: Pump run time and repairs reduced, plant washouts eliminated, chlorine gas expense reduced 35%, SSO’s reduced and total cost of pumping ad treating reduced
North Gila County, AZ
100% of basin – to be monitored
ELIMINATED OVERFLOWS – Spikes reduced 40%
North Gila County, AZ
INSTALLATION: 100% of basin – to be monitored
RESULT: ELIMINATED OVERFLOWS – Spikes reduced 40%
Vallejo, CA
40% – to comply with EPA administrative order concerning SSOs.
Eliminated overflows – EPA Administrative Order removed
Vallejo, CA
INSTALL: 40% – to comply with EPA administrative order concerning SSOs.
RESULT: Eliminated overflows – EPA Administrative Order removed
Virginia Beach, VA
Installations in 3 basins that lead to <100,000 units installed because of initial reductions.
Basins flow monitored before and after installation. 4 events were monitored after installation. Flow reductions in all basins for each event averaged a 28% inflow reduction even though the last rain event was 1.24” greater than the first.
ALL troubled basins in system now have Rainstoppers installed! >100,000
Virginia Beach, VA
INSTALLATION: Installations in 3 basins that lead to <100,000 units installed because of initial reductions.
RESULT: Basins flow monitored before and after installation. 4 events were monitored after installation. Flow reductions in all basins for each event averaged a 28% inflow reduction even though the last rain event was 1.24” greater than the first.
ALL troubled basins in system now have Rainstoppers installed! >100,000
Although the reductions varied from East to West Coast, a conservative and reasonable flow reduction of 30% can be assumed.